首页> 外文会议>World Renewable Energy Congress and Exhibition >ASSESSMENT OF FIRST PROJECT PHOTOVOLTAIC IN IRAN GRID CONNECTED TYPE
【24h】

ASSESSMENT OF FIRST PROJECT PHOTOVOLTAIC IN IRAN GRID CONNECTED TYPE

机译:伊朗网格连接型第一项目光伏的评估

获取原文

摘要

Increasing of fossil fuel demand and limited resource of fuel in different part of the world lead people to develop the new field of energy supply. Environmental issue as critical point of view in recent decade has motivated Energy policy to develop renewable energy sources around the world .Solar Energy with huge amount of solar radiation in some part of the earth is one all the main sources. Photovoltaic systems as enhanced technology are promoted to replace the conventional systems for energy supply. Iran is located in the solar radiation world belt with 4.5 kWh/m2 day of radiation which is the best motive to develop facilities for PV systems in different part of the country. Renewable energy organization of Iran with renewable development plan in the country has carried out the 30 kW PV system grid connected in Taleghan in N W part of, Tehran, capital city. Taleghan PV system power plant has been located in Alborz mountain ring with 50 degrees and 34 minute length 36 degrees and 8 minute width and 1600 masl since 2002. The paper aims to evaluate the first PV system solar power plant installation in Iran and introduce a guide line of long term development in Iran for PV systems with achieved data from Taleghan pilot system.
机译:世界各地的化石燃料需求和燃料有限资源引导人们开发了开发新的能源供应领域。作为近年来的批判性观点的环境问题具有激励能源政策,在世界各地的巨大太阳辐射中开发世界各地的可再生能源。地球上的所有主要来源都是巨大的太阳辐射。促进了光伏系统作为增强技术,以取代传统的能源系统。伊朗位于太阳辐射世界腰带,拥有4.5千瓦时/ M2的辐射,这是在该国不同部分开发PV系统的最佳动机。伊朗可再生能源组织在该国的可再生发展计划进行了位于首都德黑兰的N W部分的30 KW PV系统网格。 Taleghan PV系统发电厂已位于Alborz山圈,50度和34分钟长36度,宽度为8分钟,自2002年以来为1600 MasL。该文件旨在评估伊朗的第一个PV系统太阳能电厂安装,并介绍了导游伊朗长期开发线路用于PV系统,达到了Taleghan试点系统的数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号