首页> 外文会议>International Conference on Environment and Engineering Geophysics >Integrated geophysics detection and application for geological structure and abnormity ahead of the laneway in mine
【24h】

Integrated geophysics detection and application for geological structure and abnormity ahead of the laneway in mine

机译:矿山巷道前面的地质结构和异常综合地球物理检测及应用

获取原文

摘要

The detection and forecasting for geological structure and abnormity ahead of the laneway is a dire need and very difficult problem. No one method can solve exactly and effectively all kinds of geological problems ahead of the laneway at present. The different detection and abnormity interfaces can be gained through the integrated geophysics exploration methods, namely seismic reflection wave method and three-pole electrical resistivity method. And the different observation systems and full space data collecting and processing must be used. The exploration results have well homologous with the practical geological interfaces. The application ahead of the laneways in Xingji mine of Anhui province expresses that the geological structures ahead of the laneway about 150 miles can be explained and forecasted exactly through the integrated geophysics exploration methods. It can provide credible geological information for the safety production in the mine.
机译:在巷道前面的地质结构和异常的检测和预测是一种可怕的需求和非常困难的问题。目前没有任何一种方法可以完全求解并有效地解决所有种类的地质问题。通过集成的地球物理勘探方法,即地震反射波法和三极电阻率法,可以获得不同的检测和异常界面。并且必须使用不同的观察系统和完整空间数据收集和处理。勘探结果与实际地质界面具有很好的同源性。安徽省邢吉矿前面的申请表达了在综合地球物理勘探方法的完全解释和预测巷道前面大约150英里的地质结构。它可以为矿井安全生产提供可靠的地质信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号