LOCAL SEDIMENT MANAGEMENT AT LEEWARD-GOING-THROUGH IN PROVIDENCIALES, TURKS AND CAICOS

机译:Leeward-tound-touting在普罗维登斯,土耳其人和凯科斯的地方沉积物管理

获取原文

摘要

Dredged material was transferred from the borrow site to the beach via a pipeline cutter suction dredge. Approximately 260,000 m~3 of material was taken from the borrow area and placed on the beach. Survey transects were used to ensure complete sediment removal. The same transects continue being used to determine shoal evolution and migration. The project significantly widened and improved the severely eroded Emerald Beach shoreline by the placement of approximately 240,000 m~3 of high quality sand. The immediate post-construction survey data for the beach profiles is scheduled to be resurveyed 6 months following the initial construction project, or in February 2005. This new information will be compared to the immediate post-construction survey data to determine the shoreline change rates and the volumetric change rates. A physical and biological monitoring plan for the Emerald Beach Sand Replenishment Project has been implemented to measure and evaluate the physical and biological systems within the nearshore coastal areas surrounding Leeward-Going-Through. The purpose of the post-Project monitoring studies are to evaluate the Project's overall performance and to determine the long-term beneficial and/or adverse impacts of the Project on the coastal environment. The results of the measured changes will be used to determine if erosion amelioration measures and mitigation is required. Water Cay, immediately north of Little Water Cay and connected by Donna Cut, was planned for development requiring an access channel be dredged to move construction equipment onshore. An environmental impact statement and construction drawings were developed to satisfy outline planning needs while in depth site investigations were conducted finalizing channel alignment and sediment containment location. Sediment analysis indicated beach compatible sand and beach nourishment was planned. The complexity of site investigations, design, and management of coastal engineering projects that utilize hydraulic dredging were experienced firsthand, teaching many lessons either not taught or are impossible to teach in a university setting. All projects were relatively uneventful, considering the remote location and complex working environment. Recognition of the local interests regarding the property owner rights, government planning interests, marine environment, dredge contractor, and client all were found to be essential to effective project management. The first-hand professional experiences were invaluable for a contemporary engineering education.
机译:通过管道切割器吸入疏浚从借用网站转移到海滩上的疏浚物料。从借用区域取出约260,000毫升的材料并放在海滩上。调查横断面用于确保完全沉积物去除。相同的横断面继续用于确定浅滩演变和迁移。该项目通过放置约240,000米〜3的高品质沙子,在大约240,000米〜3的灌输中大大加宽和改善了严重侵蚀的祖母绿海滩海岸线。海滩型材的直接施工调查数据计划在初建建设项目或2005年2月后6个月重新调整。该新信息将与直接施工后调查数据进行比较,以确定海岸线变化率和体积变化率。已实施翡翠沙滩补给项目的物理和生物监测计划,以衡量和评估近岸沿海地区内的物理和生物系统。项目后监测研究的目的是评估项目的整体绩效,并确定项目对沿海环境的长期有益和/或不利影响。测量变化的结果将用于确定是否需要侵蚀改善措施和减缓。水CAY,立即北方的小水CAY和DONNA CUT联系,计划用于开发,要求驾驶通道移动陆上施工设备。制定了环境影响声明和建筑图纸,以满足大纲规划需求,同时在深度地点中进行了最终确定渠道对准和泥沙遏制位置。沉积物分析表明海滩兼容沙滩和海滩营养。首先经历了利用液压疏浚的沿海工程项目的现场调查,设计和管理的复杂性,教学许多课程,要么没有教过,要么不可能在大学环境中教授。考虑远程位置和复杂的工作环境,所有项目都相对平静。对物业所有者,政府规划利益,海洋环境,疏浚承包商和客户的局部兴趣全部发现对有利的项目管理至关重要。第一手专业经验对于当代工程教育而言非常宝贵。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号