首页> 外文会议>ALTA Copper Conference >SIZING CONSIDERATIONS FOR ACID BRICK LINING SYSTEMS FOR LARGE HYDROMET PROCESS VESSELS
【24h】

SIZING CONSIDERATIONS FOR ACID BRICK LINING SYSTEMS FOR LARGE HYDROMET PROCESS VESSELS

机译:大型水管加工容器酸砖衬砌系统的规模考虑因素

获取原文

摘要

Acid resistant brick lined vessels are utilized in pressure leaching and pressure oxidation for copper, nickel, gold and other metals. As lined vessels in hydrometallurgical processes continue to increase in scale to improve project economics, the maximum allowable size becomes a design consideration. Acid brick linings are installed in conjunction with chemical resistant membranes between the brick lining and the vessel shell. The chemical resistant membrane limits the use of anchoring systems commonly used in pyrometallurgical applications. The properties of the acid brick lining and the process must be considered when selecting the vessel size and configuration during the early design stages of a process plant.
机译:耐酸砖衬里血管用于铜,镍,金和其他金属的压力浸出和压力氧化。随着液压冶金过程中的衬里血管继续较大增加以改善项目经济学,最大允许尺寸成为设计考虑因素。耐酸砖衬里与砖衬里和血管壳之间的耐化学膜一起安装。耐化学膜限制了锚定系统通常用于高温晶径应用。当在过程植物的早期设计阶段选择血管尺寸和配置时,必须考虑酸砖衬砌和工艺的性质。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号