Scope as a Leading Indicator for Managing Software Development

机译:作为管理软件开发的领先指标范围

获取原文

摘要

Historically there has been a significant problem with scope on software projects. This study looks to computational intelligence to facilitate the monitoring of scope to provide useful information to project managers. Software projects are difficult to manage with an alarming number of projects ending as highly expensive failures. A recent study of complex projects sponsored by the Project Management Institute found that "soft issues" such as "gut feelings" might provide early warning signs on problem projects. That study suggested that additional measures beyond cost and time must be found to identify project problems. Adding scope as an additional constraint to ascertain project status can be done through the use of Computational Intelligence (CI) tools. Scope for information technology projects has properties of imprecision and vagueness, therefore fuzzy logic would be an appropriate CI tool for monitoring scope. Other papers have illustrated how Zadeh's fuzzy data collector could be used to gather scope status as a practical application of the "computing with words" paradigm. A major benefit of monitoring scope is that scope status can be a leading indicator for managing software projects. Traditional project management measures time and cost which are lagging indicators, representing resources that are unrecoverable once spent. If the status of the scope constraint is collected and correctly analyzed before the expenditure of other fixed resources, there is the potential for scope to be a predictor, or leading indicator. One analysis technique would be to adjust the status for tasks on the critical path using linguistic hedges. By adding scope as a leading indicator, a faster recognition and response to problems in software development should increase project success.
机译:从历史上看,软件项目的范围是一个重要的问题。本研究旨在计算智能,以促进对项目管理人员提供有用信息的范围。软件项目难以管理的令人担忧的项目数,以昂贵的故障结束。最近对项目管理学院赞助的复杂项目的研究发现,“肠道情绪”等“软问题”可能会对问题项目提供预警标志。该研究表明,必须发现超过成本和时间的额外措施来识别项目问题。将范围添加为确定项目状态的额外约束可以通过使用计算智能(CI)工具来完成。信息技术项目的范围具有不精确和模糊性的性质,因此模糊逻辑将是一个适当的监控范围的CI工具。其他论文已经说明了Zadeh的模糊数据收集器如何用于将范围状态收集为“用单词”范式的“计算”的实际应用。监测范围的主要好处是,范围状态可以是管理软件项目的领先指标。传统的项目管理衡量时间和成本是滞后指标,代表不可恢复的资源一旦花费。如果在其他固定资源支出之前收集并正确分析了范围约束的状态,则可能潜在的范围是预测因子或领先的指标。一个分析技术是使用语言树篱调整关键路径上的任务状态。通过将范围添加为前导指标,更快地识别和对软件开发问题的响应应该增加项目成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号