A Case Study of Overbreak Control in Tunnel Blasting

机译:隧道爆破中爆发控制的案例研究

获取原文

摘要

Control of overbreak in tunnel blasting is one of the key factors affecting the construction expenses as well as safety. Overbreak causes an increase in the cost of construction by requiring an additional amount of shotcrete. In addition, blast damage to the final rock face may cause instability and rock fall hazards. For these reasons, controlled blasting is an indispensable routine in tunnel excavation in order to get a smooth face and to reduce damage to the final wall. We have experienced a very poor quality of excavation depending on the tunneling sites although a similar design of controlled blasting technique was applied. Field experiments over 40 rounds were carried out to investigate the cause of the poor results in tunnel blasting. In this paper, discussed are the parameters affecting the overbreak and some findings from the field experiments. Overbreak could be controlled considerably by adjusting some parameters before the efforts of developing a new blasting method.
机译:隧道爆炸爆炸的控制是影响建筑费用以及安全性的关键因素之一。通过需要额外的喷射器导致施工成本增加,导致施工成本增加。此外,对最终岩石面的爆炸损坏可能导致不稳定和岩石灾害危险。由于这些原因,受控爆破是隧道挖掘中不可或缺的例程,以便获得光滑的面部并减少对最终墙壁的损坏。尽管应用了类似的受控爆破技术的设计,因此我们经历了非常差的挖掘质量。进行了40次超过40轮的实验,以调查隧道爆破的差的原因。在本文中,讨论的是影响突破的参数以及现场实验的一些发现。通过在开发新的爆破方法的努力之前调整一些参数,可以大大控制悬漏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号