Study of the Right-Bank Contiguity of the Dam at the Vilyui Hydroelectric Power Plant

机译:VILYI水力发电厂水坝右岸矩阵研究

获取原文

摘要

In the paper in order to ascertain the condition of the right — bank of the dam at the Vilyui hy- droelectric power plant measurements are applied to obtain experimental date such as drilling borehole, hydrolocation and so forth. By finding out the distribution of the temperature field some corresponding measures are taken to improve the stability of the dam during the change of the ground temperature. And finally some conclusions are draw to the study.
机译:在该论文中,为了确定瓦里伊的水坝右岸的条件,可以应用测量,以获得实验日,例如钻孔钻孔,水泥系等。通过找出温度场的分布,采取了一些相应的措施来提高坝体变化过程中坝的稳定性。最后得出一些结论是对这项研究的。