首页> 外文会议>International Conference on Dam Engineering >Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures
【24h】

Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures

机译:用灌浆窗帘封闭系统渗漏渗漏分析,排水和泵送措施

获取原文

摘要

The closed system of grouting curtain, drainage and pumping measures should be designed and built where the downstream water level is high. The combined theoretical and numerical method is utilized to analyze the seepage field and its factors in the dam foundation with the close system. It can be shown that, (1) seepage flows from the upstream to the downstream, also flows mainly from the upstream and the downstream to the pimping well in dam foundation; (2) the grouting curtain controls the seepage discharge; and (3) the good service condition of the drainage and pumping system can decrease largely the hydrostatic seepage pressure (or the uplift pressure).
机译:应设计和建造下游水位高的灌浆窗帘,排水和泵送措施的封闭系统。利用联合的理论和数值方法分析渗流场及其在坝基中与近端系统的因素。可以表明,(1)渗流从上游流到下游流动,也主要从上游和下游流动到坝基中的PIMPy井; (2)灌浆窗帘控制渗流放电; (3)排水和泵送系统的良好服务条件在很大程度上可以降低静液压渗流压力(或挤压压力)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号