首页> 外文会议>International Conference on Dam Engineering >Concrete construction technology in Phase II dam of Three Gorges Project
【24h】

Concrete construction technology in Phase II dam of Three Gorges Project

机译:三峡工程第二阶段混凝土施工技术

获取原文

摘要

Concrete construction is one of the most important and most challenging projects in the Three Gorges Project (hereinafter called TGP) Construction since it features mammoth amount, high intensity, complex structure, and strict requirement in the Phase II dam and powerhouse construction. The paper is intended to analyze difficulties of the quality control of concrete construction, to systematically present the concrete construction scheme and temperature control measures to prevent concrete cracks, and to brief concrete construction progress and quality control effect.
机译:具体建设是三峡工程中最重要,最具挑战性的项目之一(以下称为TGP)施工,因为它具有锯割,高强度,复杂的结构,严格要求II水坝和省电建设。本文旨在分析混凝土施工质量控制的难度,以系统介绍混凝土施工方案和温度控制措施,以防止混凝土裂缝,并简要施工进展和质量控制效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号