首页> 外文会议>International Conference on Dam Engineering >Preliminary research on flood discharge dissipation of Xiangjiaba Hydropower Project
【24h】

Preliminary research on flood discharge dissipation of Xiangjiaba Hydropower Project

机译:湘家坝水电项目洪水排放耗散初探

获取原文

摘要

Due to the environment and navigation conditions, underflow energy dissipation is advisable to be employed in the design of Xiangjiaba Hydroelectric Project. However, it is rare in China and yet in the world to use such an underflow energy dissipater for such a high water head and a large flow discharge. With a great number of laboratory tests and studies, the high- and low-sill alternative has been proposed, with which the hydraulic indices are to be controlled within the acceptable range and that can well solve the issue of flood discharging and energy dissipation in the Xiangjiaba Hydroelectric Project.
机译:由于环境和导航条件,建议在湘家坝水电项目的设计中采用下溢能量耗散。然而,在中国罕见,在世界上很少使用这种底部流量消散,用于这种高水头和大流量放电。通过大量的实验室测试和研究,已经提出了高和低窗台替代方案,其中液压指数将在可接受的范围内控制,可以很好地解决洪水排放和能源耗散的问题湘家坝水电项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号