CONSTRUCTION, OPERATION, AND MAINTENANCE OF THE FORT CHIPEWYAN WINTER ICE ROAD

机译:堡芯片冬季冰路的施工,操作和维护

获取原文

摘要

Fort Chipewyan, Alberta is a remote Northern community of a population of about 920 that is isolated on the north side of Lake Athabasca about 720 km north of Edmonton and 260 km north of Fort McMurray, Alberta. In the summer, goods are transported to the hamlet by air and barges, but in the winter, after the lake freezes, an ice road is used. There is a time as between the first freeze-up and when the ice road is complete when the goods must be flown in. This paper discusses the construction and maintenance practices for the Fort Chipewyan winter ice road. This ice road is over 195 km long and comprises three main sections: (1) the "on-land" section, where the road is constructed in deep muskeg in some areas and sand in others (2) several river crossings over the Athabasca, Embarras, Quatre Fourches, and Des Roches Rivers (3) the final section of the road over Lake Athabasca. Construction begins usually in mid-November when the temperatures drop consistently below -18?C at night and when the daytime temperatures do not permit thawing. The portions of the road through the sandy areas are worked on first, where the road is leveled using normal road construction equipment and the sand is sprayed with water using 3000 Gallon water trucks to freeze the sand. The muskeg sections are then leveled and frozen in the same way. Work on the rivers and lake must wait until the water bodies have adequately frozen. On the lake, small trees are place alongside the road to mark the path. When complete, a journey on the road will take approximately 4.5 h to travel from Fort McMurray to Fort Chipewyan. Operation conditions and maintenance of the ice road are also discussed.
机译:堡奇佩维安,阿尔伯塔省是在阿萨巴斯卡湖约埃德蒙顿720公里处和麦克默里堡,阿尔伯塔省260公里处北侧隔离的约920人口的偏远北部地区。在夏季,货物运送到空气和驳船的小村庄,但在冬季,湖面结冰后,用冰路。有一个时间作为第一封河之间时,冰路完成后,货物必须空运过来的。本文讨论了奇帕维安族地区冬季冰雪路面的建设和维护的做法。这冰雪路面是195个公里长,包括三个主要部分组成:(1)在“陆上”部分,这里的路在深苔藓构建在其他一些地区和沙子(2)几个渡口在阿萨巴斯卡Embarras,世嘉Fourches,及德罗切斯河(3)道路在阿萨巴斯卡湖的最后一节。建设通常开始于十一月中旬的时候晚上气温持续低于-18?C和当白天气温不允许解冻。通过沙区道路的部分是在第一个工作,那里的道路是用正常的道路工程机械平整,沙子被喷上使用水3000加仑水的卡车冻结沙子。然后沼地部分被夷为平地,并以同样的方式冻结。河流和湖泊工程必须等到水体已充分冻结。湖上,小树木的地方旁边的道路标记的路径。完成后,道路上的旅程大约需要4.5小时,从麦克默里到奇佩维安堡堡旅行。操作条件和冰雪路面的维修进行了讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号