An Automated System for Cost Estimating and Cost/Schedule Control for Industrial Construction Projects

机译:工业建设项目成本估算与成本/安排控制的自动化系统

获取原文

摘要

Cost estimating and cost/schedule control of industrial construction projects needs careful planning in order to ensure the effective use of cost and time. The need for developing an efficient computer automated system that can process data associated with pipe configurations, and the related issues concerning the type of work, the required man-hour, equipments, and the material required to perform these tasks cannot be ignored. This paper presents the process used to implement an automated system for cost estimating and cost/schedule control for the construction of industrial facilities. The methodology of this automated system has been incorporated into a computer system that integrates both a cost estimating module and time tracking module. Both modules share a central database system. This methodology has been developed in collaboration with an industrial partner (Chancellor Industrial Construction Ltd., Edmonton, Alberta, Canada). The developed computer system was implemented using SQL-Server, MS-Visual Basic programming language, and Active Reports for MS-Visual Basic.
机译:工业建筑项目的成本估算和成本/安排控制需要仔细规划,以确保有效使用成本和时间。需要开发一种有效的计算机自动化系统,可以处理与管道配置相关的数据,以及有关工作类型的相关问题,所需的人小时,设备以及执行这些任务所需的材料不能忽视。本文介绍了用于实施自动化系统以实现工业设施建设的成本估算和成本/安排控制的过程。该自动化系统的方法已被纳入计算机系统中,该计算机系统集成了成本估计模块和时间跟踪模块。两个模块共享一个中央数据库系统。该方法是与工业合作伙伴合作制定的(总理工业建筑有限公司,埃德蒙顿,加拿大艾伯塔省)。开发的计算机系统是使用SQL-Server,MS-Visual Basic编程语言和MS-Visual Basic的活动报告实现的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号