Multi-Lateral well technology has been utilized in the infill development drilling in the North East Intan Alpha field offshore south Java Sea, Indonesia. The primary incentives to apply Multi-Lateral well technology on this project were to: minimize the further capital investment of installing an additional platform structure by maximizing slot usage, increase the total field production by drilling all the infill wells in the development program, and to increase production by combining the targets. In August 2002, China National Offshore Operating Company installed the world's first TAML (Technology Advancement of Multilateral) Level 6 Multilateral with an intelligent completion using artificial lift. Rapid Seal™ is a symmetrical dual-leg TAML level 6 junction that optimizes the branch/parent diameter ratio while providing a predictable mechanical integrity based on a known geometry. The junction legs are compressed so that the overall junction outer diameter is comparable to that of the parent casing. As a result, casing size loss is reduced in the transition between the parent casing and the two symmetrical outlets. The compressed-shape dual-leg junction is run in the hole at the bottom of the parent casing. The junction legs are expanded down-hole to their original outer diameter using a down-hole junction forming process based on wireline technology. Well NE-Intan A-24ml was drilled and completed with both laterals producing from the 31-1 Sands. The 9 5/8in. Rapid Seal~(TM) junction was used to create the transition from the 9 5/8in. casing to two 6 1/8in. laterals that were completed with 3 1/2in. Premium screens in lateral 1 and 4 1/2in. Premium screens in lateral 2. ECP technology was employed to isolate the producing zones from the upper hole section. This paper will describe the candidate selection process, economic feasibility, planning, drilling, junction deployment and finally the completion of the well.
机译:在印度尼西亚南爪哇南爪哇省南爪哇省的填充开发钻井中,多侧井技术已被利用。应用多横向井技术的主要激励措施是:最大限度地减少通过最大限度地使用插槽使用,通过钻探开发计划中的所有填充井来增加总现场生产的进一步资本投资通过组合目标来增加产量。 2002年8月,中国海上运营公司安装了世界上第一个TAML(技术进步多边)6级多边,使用人工升降机完成智能完成。 RAPID SEAL™是一个对称的双腿TAML级别6接合点,其优化分支/父直径比,同时基于已知几何形状提供可预测的机械完整性。结腿被压缩,使得整个结的外径与母壳的相当相当。结果,在母壳和两个对称出口之间的转换中减小了壳体尺寸损耗。压缩形状的双腿结在父壳底部的孔中运行。结腿使用基于有线技术的下孔结形成过程将凹坑扩展到其原始外径。 Ne-Intan A-24ml被钻探并完成了从31-1砂的侧面生产的。 9 5/8英寸。快速密封〜(TM)结用来从9 5/8中产生过渡。套管到两个6 1/8英寸。用3 1/2in完成的侧面。侧向1和4 1 / 2in的高级屏幕。横向2. ECP技术的高级屏幕用于将生产区域与上孔部分隔离。本文将描述候选选拔过程,经济可行性,规划,钻井,盟路部署,最后完成井的完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号