Centre for Advanced Technology is developing its second synchrotron radiation source INDUS-2 which is a 2.5 GeV electron storage ring. Dipole vacuum chambers are the vital components of Indus-2 vacuum system. Each of these chambers is approx. 3.6 m long and 0.67 m wide with 24 nos. of ports of various sizes. The dipole chambers were made by machining two halves and they are then lip welded together. The dipole chamber has approx. 14 m of total weld length and it was leak tested for leak tightness of the order of 10-10 mbar l/s. Helium mass spectrometer leak detector (HMSLD) was utilized for the leak testing. Subsequently the leaks of various orders in welding joints were repaired and leak tightness achieved. This paper describes the experiences during leak testing of 20 nos. of Aluminum dipole chambers for INDUS-2.