Several special problems existing in restoration of Guangdong power network are discussed, which involve in the influences of nuclear power stations, large pumped storage stations, hybrid AC/DC transmission networks, dispersed small generations governed by area control centers, and coordination of Guangdong power grid with area control centers etc, on the restoration strategies. Some ideas and methods are proposed to solve the realistic problems concerning Guangdong power network restoration.
展开▼