首页> 外文会议>International Friction Stir Welding Symposium >Space Shuttle ET Friction Stir Weld Machines
【24h】

Space Shuttle ET Friction Stir Weld Machines

机译:航天飞机ET摩擦搅拌焊接机

获取原文

摘要

The first flight-qualified hardware was welded at the close of 2002. The FSW program originally called for an additional machine to be used to either weld the opposite side (root) of each weld or to be available to perform repair passes as required. Part way through the design and review process for these machines, NASA was sufficiently confident that this equipment would produce sound welds from one side that the additional weld station was eliminated. Implementation of the FSW process into ET production is a successful Shuttle Upgrade Program. This technology and equipment will make the shuttle program safer and more affordable. FSW of the Space Shuttle ET will be one of the most visible and publicized applications of the process, and General Tool is proud to have been a part of it. Finally, NASA was so pleased with the innovative features of these tools that Ron Dittemore, Space Shuttle Program Manager, presented the "Space Shuttle Program STAR Award" to the author in May of 2003.
机译:第一次飞行合格的硬件在2002年关闭。FSW程序最初要求额外的机器用于焊接每个焊缝的相对侧(根)或可用于根据需要进行修理通过。部分方法通过这些机器的设计和审查过程,美国国家航空航天局充分信心该设备从一侧产生额外的焊接站被消除的焊接焊缝。将FSW进程的实施进入ET生产是一个成功的刨班升级计划。这种技术和设备将使梭子程序更安全,更实惠。 Space Shuttle等的FSW将是该过程中最明显和最明显的宣传应用之一,并且普通工具很自豪能够成为其中的一部分。最后,美国宇航局对这些工具的创新特征感到满意,这些工具是ron ditemers航天飞机计划经理,于2003年5月向作者提出了“航天飞机节目明星奖”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号