Investigation of No6 Blast Furnace Hot Stove Ceramic Burner Problems and Development of Hot Repair Techniques

机译:No6高炉热炉陶瓷燃烧器问题的调查与热修复技术的发展

获取原文

摘要

No6 Blast Furnace, Port Kembla Australia, was commissioned in 1996. During 2000, problems were experienced with gassing of 62 Stove. Remote internal camera inspections showed some signs of deterioration of endwall brickwork in the ceramic burner. Internal visual inspections in October 2000 revealed imminent collapse of burner endwalls. Business conditions would not tolerate the production losses that would have been associated with a conventional cold repair. The imminent need of the repair also precluded replacement of the entire burner. Innovative solutions were developed to allow the repair to be conducted in the hot condition. A newly developed refractory material was selected after a process of careful evaluation. The repair was completed in December 2000, just 8 weeks after the discovery of the extent of damage. The repair was completed in 6 days where a conventional cold repair would have taken up to 40 days. The results have been excellent.
机译:No6 Blast Furnace,Kembla澳大利亚Port Kembla澳大利亚于1996年委托。在2000年期间,有62张炉子的问题出现了问题。远程内部摄像头检查显示陶瓷燃烧器内壁砖块劣化的迹象。 2000年10月内部视觉检查显示燃烧器端墙的即将崩溃。业务条件不会容忍与传统冷修复有关的生产损失。迫在眉睫需要修复也排除了整个燃烧器的更换。开发了创新解决方案,以便在热状态下进行维修。在仔细评估过程之后选择了新开发的耐火材料。该维修于2000年12月完成,仅在发现损害程度后8周。修复在6天内完成,常规冷修复最多40天。结果非常出色。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号