首页> 外文会议>Ironmaking conference >The Development of Puverized Coal Injection Lance With Air Cooling in N0.3 Blast Furnace
【24h】

The Development of Puverized Coal Injection Lance With Air Cooling in N0.3 Blast Furnace

机译:N0.3高炉空气冷却污染煤注射喷枪的发展

获取原文

摘要

Except reducing fuel cost, PCR can demonstrate the BF technical level due to requiring more delicate skills for promoting PCI operation. Since the commencement of PCI at No. 3 BF in November, 1993, the difficulties encountered during increasing PCI rate to 130 kg/thm were lance clogging and erosion, tuyere failures, and the poor permeability in furnace. The stability of PC transportation has been improved by the PCI lance clogging prevention system, the selection of proper PC specification, the transportation line modification as reducing pressure drop, and the double air-cooled coaxial lance, etc. The PC combustion efficiency has also been enhanced by double air-cooled coaxial lance as decreasing unburnt coal Through the proper burden distribution, the adjustment of theoretical flame temperature and the reduction of slag rate, the PCI rate has reached at 160 kg/thm along with higher productivity. The total benefit of this project is estimated to be 131 million per year due to the reduction of the fuel cost at No. 3 BF of CSC. Besides, the greenhouse effect is reduced with less carbon dioxide emissioa
机译:除降低燃料成本外,PCR可以展示BF技术水平,因为需要更精细的促进PCI操作技能。自1993年11月在第3号BF的PCI开始以来,在将PCI率增加到130公斤/ THM期间遇到的困难是天枪堵塞和侵蚀,风口故障,以及炉内透气性差的渗透率。 PCI Lance堵塞防范系统的稳定性得到了改善,选择适当的PC规格,运输线改性为减压压降,以及双风冷同轴矛等.CC燃烧效率也在通过双风冷同轴矛盾增强,通过适当的负荷分布,调节理论火焰温度的调整和渣速的减少,PCI速率达到160千克/ THM,提高了更高的生产率。由于CSC的第3位BF的燃料成本降低,该项目的总益处估计为每年1.31亿。此外,温室效应减少了较少的二氧化碳emissioa

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号