首页> 外文会议>Annual transmission and substation design and operation symposium >On-Load Tap Changer Health Assessments: A Dynamic Approach to Preventive Maintenance
【24h】

On-Load Tap Changer Health Assessments: A Dynamic Approach to Preventive Maintenance

机译:载载分接开关健康评估:一种预防性维护的动态方法

获取原文

摘要

In January 2010, LCRA TSC Asset Performance and Reliability (APR) developed a health-assessment program for LCRA's on-load tap changers (LTCs) for transmission and distribution voltage regulation. Each LTC is assigned a score on a 100-point scale, based on an educated and objective evaluation of various factors. These factors, including operations history, maintenance history, age, internal condition, and LTC type, are weighted according to their importance in determining equipment health. The weight of each factor is kept constant when assessing each LTC, and a comparison of health scores is made across the entire fleet of LTCs. This approach allows LCRA to center preventive maintenance efforts on those LTCs which fall in the caution zone. An LTC whose overall health is determined to be exemplary may qualify for deferred preventive maintenance. Under the current program, LCRA deferred maintenance on six LTCs (50% of those due for preventive maintenance) in 2010. This dynamic approach to preventive maintenance saves valuable time and O&M costs, and provides LCRA's maintenance engineers with broad knowledge on the health of a vital fleet of equipment.
机译:2010年1月,LCRA TSC资产绩效和可靠性(APR)为LCRA的配载分接换碟机(LTC)开发了一种用于传输和分配电压调节的健康评估计划。基于各种因素的受过教育和客观评估,每个LTC都以100分尺度分配一个分数。这些因素包括运营历史,维护历史,年龄,内部条件和LTC类型,根据它们在确定设备健康方面的重要性而加权。评估每个LTC时,每个因子的重量保持恒定,并且在整个LTC的整个舰队中进行健康分数的比较。这种方法允许LCRA在落在警告区域的LTC上进行中心预防性维护工作。一个LTC,其整体健康成为示例可能有资格获得延期预防性维护。在目前的计划下,2010年LCRA延迟了六个LTC的维护(50%的50%的预防性维护)。这种预防性维护的动态方法可节省宝贵的时间和O&M成本,并为Lcra的维护工程师提供了具有广泛的健康知识的维护工程师。重要的设备舰队。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号