【24h】

OPERATORS EXPERIENCE WITH FLEXIBLE RISERS

机译:操作员体验灵活的立管

获取原文
获取外文期刊封面目录资料

摘要

Norsk Hydro has more than 150 flexible dynamic risers and service lines in operation. Norsk Hydro's experience with flexible risers started in 1987 when Petrojarl 1 commenced test production at the Oseberg Field. The paper tells the story about Norsk Hydro's experience through the 15 years of trials with a new and complicated product. This paper will focus on "what went wrong". This may seem unfair to the product! However, without flexibles we would probably not have seen such successful field developments as the Troll B and C, Njord, Visund and Snorre B. Challenging production and installation schemes have been put forward and fulfilled. However, hopefully this paper can give an insight in failure modes, and so forth give input to enhanced solutions in order to avoid similar situations in the future. This paper gives an overview over the different approaches which have been taken to give a better qualification of the lifetime prediction of the risers. Some of the specific projects will be presented in detail in other papers on this conference.
机译:Norsk Hydro拥有超过150个灵活的动态立管和服务线。 Norsk Hydro的灵活立管的经验于1987年开始,当Petrojarl 1在Oseberg领域开始测试生产。本文通过新的和复杂产品的审判讲述了Norsk Hydro的经验。本文将专注于“出错”。这对产品似乎是不公平的!然而,没有灵活性,我们可能没有看到这种成功的现场发展,作为巨魔B和C,南朝,依据和诽谤B.挑战生产和安装方案已经提出和实现。但是,希望本文可以介绍失败模式,等等为增强的解决方案提供输入,以避免将来的类似情况。本文概述了以不同的方法概述,这些方法已经采取了更好的提高提升机的寿命预测。一些具体项目将在此次会议上的其他文件中详细介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号