首页> 外文会议>Annual Meeting of the North American Fuzzy Information Processing Society >Computational model for measuring project complexity in construction
【24h】

Computational model for measuring project complexity in construction

机译:施工中项目复杂性测量的计算模型

获取原文

摘要

As construction projects are increasingly complex, a systematic approach for assessing their complexity is imperative. The Fuzzy Analytic Hierarchy Process (Fuzzy AHP) method was employed to determine the local and global weights of the criteria and sub-criteria in project complexity. The overall project complexity is quantified by a proposed measure, named complexity level (CL). A computational model was developed in MATLAB to facilitate calculations in Fuzzy AHP, conduct sensitivity analysis, and visualize results. The application of the model was illustrated in a case study of three transportation projects performed by a heavy construction company. The proposed complexity level enables engineers and managers to better anticipate potential difficulties in their complex construction projects. Scarce resources will be therefore allocated efficiently in various construction projects in a company's portfolio.
机译:随着建筑项目越来越复杂,可以评估其复杂性的系统方法是必要的。 采用模糊分析层次处理(模糊AHP)方法来确定项目复杂性标准的局部和全局权重。 整体项目复杂性通过建议的措施来量化,命名复杂程度(CL)。 在MATLAB中开发了计算模型,以促进模糊AHP的计算,进行灵敏度分析和可视化结果。 该模型的应用在沉重建筑公司执行的三个运输项目的情况下说明了。 拟议的复杂程度使工程师和管理人员能够更好地预测复杂的建筑项目中的潜在困难。 因此,将在公司组合的各种建筑项目中有效地分配稀缺资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号