首页> 外文会议>International Conference on High-Power Particle Beams >Plasma Opening Switch Synchronization Facility
【24h】

Plasma Opening Switch Synchronization Facility

机译:等离子打开开关同步设施

获取原文

摘要

The Baikal program provides a superpower generator creation which uses a plasma opening switch for output pulse production. The MOL facility is being developed within the frames of this program to test main units and systems of the planned generator at 4-6 MV, 3 MA and 100 ns. The MOL facility is planned to use 7 parallel plasma opening switch modules placed in the relatively compact vacuum chamber of 140 cm diameter. This aims at solving two main technical issued: plasma opening switch module development with external applied magnetic field and plasma switch modules synchronization. The paper describes plasma switch module design and low inductance load synchronization experimental tests results.
机译:BAIKAL计划提供了一种超级大动力发生器创建,它使用等离子开关进行输出脉冲产生。 MOL设施正在在该程序的帧内开发,以测试计划发电机的主机和系统,在4-6 mV,3 mA和100​​ns。摩尔设施计划使用置于140cm直径的相对紧凑的真空室中的7个平行等离子开口开关模块。这旨在解决两个主要技术发布的:等离子开口开关模块开发,采用外部施加的磁场和等离子体开关模块同步。本文描述了等离子体开关模块设计和低电感负载同步实验测试结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号