首页> 外文会议>International Conference on Nuclear Engineering >Renovation of chemical processing facility for development of advanced fast reactor fuel cycle system in JNC
【24h】

Renovation of chemical processing facility for development of advanced fast reactor fuel cycle system in JNC

机译:JNC中先进快速反应堆燃料循环系统开发的化学加工设施的翻新

获取原文

摘要

The CPF had 4 laboratories (operation room A, laboratory A, laboratory C and analysis laboratory) in connection with reprocessing technology. The main laboratory, operation room A, has 5 hot cells. Since equipments in the main cell had been designed for small-scale verification of existing reprocessing steps, it was hardly able to respond flexibly to experimental studies on advanced technology. It was decided to remodel the cell according to the design that was newly laid out in order to ensure the function and space to conduct various basic tests. The other laboratories had no glove boxes for conducting basic experiments of important elements in the advanced reprocessing, such as actinides except U and Pu, lanthanides and so on. In order to meet various requirements of innovative technologies on advanced fuel cycle development, one laboratory is established more for study on dry reprocessing, and glove boxes, hoods and analytical equipments such as NMR, FT-IR, TI-MS are newly installed in the other laboratories in this renovation. After the renovation, hot tests in the CPF will be resumed from April 2002.
机译:CPF与再加工技术有4个实验室(操作室A,实验室A,实验室C和分析实验室)。主要实验室,操作室A,有5个热细胞。由于主电池的设备已经设计用于对现有的再处理步骤的小规模验证,因此很难能够灵活地对先进技术的实验研究进行响应。它决定根据新布局的设计重塑电池,以确保要进行各种基本测试的功能和空间。另一个实验室没有手套箱,用于在先进的再加工中进行重要元素的基本实验,例如除U和PU,镧系之外的散曲线,等等。为了满足先进燃料循环发展的创新技术的各种要求,建立了一个实验室,用于研究干燥后处理,以及新安装的手套箱,罩和分析设备,如NMR,FT-IR,TI-MS在这种装修中的其他实验室。经过翻新后,CPF中的热门测试将于2002年4月恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号