首页> 外文会议>International Conference on Nuclear Engineering >Design characteristics of Ulchin nuclear power plant units 56
【24h】

Design characteristics of Ulchin nuclear power plant units 56

机译:ULCHIN核电站装置5&6的设计特点

获取原文

摘要

Ulchin nuclear power plant units 5&6(UCN 5&6), which started excavation on January 1999, are two loop pressurized water reactors (PWR) with the capacity of 1000 MWe, and planned to start commercial operation on June, 2004 and June, 2005, respectively. The reactor coolant system of the UCN 5&6 consist of a reactor vessel. internals, and two steam generators, four reactor coolant pumps, a pressurizer and primary piping. Based on the system design of the first Korean Standard Nuclear Power Plant (KSNP). UCN 5&6 is designed to provide improvements in safety, reliability and cost by applying both advanced proven technology and experiences gained from the construction and operation of the previous KSNP plants. The result of the preliminary probabilistic safety assessment study for UCN 5&6 shows that the core damage frequency is lowered significantly. Several design improvement items have been adopted to the system design and contributed to lower the core damage frequency value. Among the design improvements, digital PPS and digital ESFAS are the key to the UCN 5&6 design. Furthermore, digitization of the Plant Protection System (PPS) and Engineered Safety Feature Actuation System (ESFAS) for the PWR is the first case in the PWR construction history. The Korean regulatory body reviewed the design concept of the digital PPS and digital ESFAS, and evaluated to be acceptable for the plant safety. Also, in-depth review on the detail design of the digital PPS/ESFAS and the special evaluation/audit for the software design process are underway to secure the software quality. The safety of the UCN 5&6 design has been evaluated through a two-year review on the preliminary safety analysis report. As a result, the construction permit was issued on May 17, 1999 by the government. In this paper, design characteristics of UCN 5&6 are discussed focussed on design improvements comparing with KSNP. And. some of the safety analysis results are presented as welt as licensing status.
机译:Ulchin核电站1月5日(UCN 5&6)在1999年1月开始开挖,是两个环加压水反应堆(PWR),容量为1000米,并计划分别于2005年6月和2005年6月开始商业运营。 UCN 5和6的反应器冷却剂系统由反应器容器组成。内部,两个蒸汽发生器,四个反应器冷却剂泵,加压器和初级管道。基于第一韩国标准核电站(KSNP)的系统设计。 UCN 5&6旨在通过应用先前KSNP植物的建设和运营所获得的先进经验化技术和经验来提供安全性,可靠性和成本的改进。 UCN 5和6初步概率安全评估研究的结果表明,核心损伤频率显着降低。已经采用了几种设计改进项目对系统设计并有助于降低核心损坏频率值。在设计改进中,数字PPS和数字ESFA是UCN 5和6设计的关键。此外,PWR的植物保护系统(PPS)和工程安全特点驱动系统(ESFA)的数字化是PWR施工历史中的第一种情况。韩国监管机构审查了数字PPS和数字ESFA的设计理念,并评估了工厂安全可接受的。此外,正在对数字PPS / ESFA的详细设计和软件设计过程的特殊评估/审计进行深入审查,以确保软件质量。通过关于初步安全分析报告的两年审查,已通过两年审查评估了UCN 5和6设计的安全。因此,施工许可证于1999年5月17日由政府发布。在本文中,讨论了UCN 5和6的设计特征,重点是与KSNP相比的设计改进。和。一些安全分析结果作为许可证状态呈现为WELT。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号