【24h】

Tendering / Procurement of safety systems: A general approach to effective contracting

机译:招标/采购安全系统:一种有效签约的一般方法

获取原文

摘要

Calling for tenders in the railway business is a major task and it determines highly the costs and benefits of the later safety systems. Special attention is paid to these early phases because 1. There are new company alliances for operation and maintenance (sometimes involving companies new in the railway business); 2. Comprehensive business cases are required including evaluation of all costs and benefits during the system lifecycle; 3. The evaluation of new, low-cost systems becomes necessary; 4. Change of legal frame due to new standards and laws. For this reason the procurement phases, analysing feasibility and specifying the requirements are sometimes long lasting due to revisions and re-specifications. If the tendering documents and specifications are very comprehensive and unspecific, this will lead to additional costs for legal support, bidding, and re-specification. To cope with these problems we present a general process that contributes to a more structured way to specify requirements. Tailoring the process leads to effective contracting. Key indicators - like safety and availability - are clearly specified and contractual agreed.
机译:呼吁铁路业务中的招标是一个主要的任务,它可以高度确定后来安全系统的成本和益处。特别注意这些早期阶段,因为1.有新的公司联盟进行运营和维护(有时涉及铁路业务中的公司); 2.需要综合业务案例,包括在系统生命周期内评估所有成本和福利; 3.对新的低成本系统进行评估; 4.由于新标准和法律,法律框架的变更。出于这个原因,采购阶段,分析可行性和指定要求有时由于修订并重新规范而持久。如果招标文件和规范非常全面,并且不明显,这将导致法律支持,投标和重新规范的额外成本。为了应对这些问题,我们提出了一个有助于更具结构化的方法来指定要求。剪裁过程导致有效的合同。关键指标 - 类似安全和可用性 - 明确指明和合同商定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号