首页> 外文会议>International Conference on Radioactive Waste Management and Environmental Remediation >THE DISMANTLING OF PRIMARY AND AUXILIARY LOOPS OF THE BR3-PWR REACTOR: FROM ON SITE DECONTAMINATION UP TO FINAL EVACUATION OF THE DISMANTLED MATERIALS
【24h】

THE DISMANTLING OF PRIMARY AND AUXILIARY LOOPS OF THE BR3-PWR REACTOR: FROM ON SITE DECONTAMINATION UP TO FINAL EVACUATION OF THE DISMANTLED MATERIALS

机译:BR3-PWR反应器的初级和辅助回路的拆解:从现场去污到拆除材料的最终疏散

获取原文

摘要

SCK*CEN is dismantling its small BR3 PWR reactor. For the management of the contaminated loops, we decided first to decrease the dose rate by a chemical decontamination of the circuits. A complete dismantling of the loops and of the equipment's follows this. After a careful sorting of the pieces, we select the optimised management route, which will lead to a minimum of radioactive waste disposed. This paper gives the results of the management of the pieces arising from the dismantling of the most contaminated loops of the plant. We show that it is possible to recycle most of the metallic materials either in the nuclear world or in the industrial world by reaching the respective recycling or clearance criteria.
机译:SCK * CEN正在拆除其小BR3 PWR反应器。对于污染环的管理,我们首先决定通过电路的化学净化来降低剂量率。完全拆除循环和设备的追踪。经过仔细排序碎片后,我们选择优化的管理路线,这将导致设置的放射性废物最少。本文给出了拆除植物最污染环的拆除所产生的碎片的结果。我们表明,通过达到各自的回收或许可标准,可以在核环境或工业世界中回收大部分金属材料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号