In a nuclear power plant, offsite and onsite electric power systems are required to provide sufficient capacity and capability to assure that the containment integrity be maintained during power operation or in case of a postulated accident. Analyses must verify that the electric grid remains stable in case of loss of the nuclear unit, the largest other unit on the grid or the most critical transmission line and a change it due to deregulation would affect those analyses. Nuclear Regulatory Commission (NRC) staff ensures that the licensees maintain adequate voltages to the Class 1 E (safety) buses. If the operator has failed to restore adequate voltages, the Class 1 E buses should be automatically separated from the offsite power system and connected to the emergency diesel generators. Most utilities use on-line contingency analysis and the control centers notify them when the offsite power system in their nuclear plant is degraded. The control centers use load conservation procedures to provide the plant a stable offsite power system. The control centers have assured the NRC staff that the nuclear power plants are their preferred customers and that they will be provided with an adequate offsite power system even under reduced grid generation availability. This paper discusses the voltage stability, power transfer limits, reactive reserves, methods of improving voltage stability (such as superconductivity), load conservation procedures and effects of deregulation on nuclear power generating stations.
机译:在核电站,特性和现场电力系统需要提供足够的容量和能力,以确保在电力运行期间或在出发事故时保持遏制完整性。分析必须验证电网在核电站丢失的情况下,电网上的最大其他单位还是最关键的传输线和由于放松管制而改变它会影响这些分析。核监管委员会(NRC)工作人员确保许可证人对1级(安全)公共汽车保持足够的电压。如果操作员未能恢复足够的电压,则1级e总线应自动与异地电源系统分离,并连接到紧急柴油发电机。大多数公用事业公司使用在线应急分析,并且控制中心在其核电站中的异地电力系统降级时通知它们。控制中心使用负载节约程序来提供厂房稳定的异地电力系统。控制中心确保了NRC工作人员,即核电厂是他们的首选客户,即使在缩短电网发电可用性下,它们也将提供足够的非现场电力系统。本文讨论了电压稳定性,功率传递限制,无功储量,提高了电压稳定性(如超导性),负荷节约程序和放松管能力对核发电站的影响的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号