LOFAST - A fixed connection between Lofoten and the mainland

机译:Lofast - 洛菲登和大陆之间的固定连接

获取原文

摘要

The Lofast project will give the population (25.000) of Lofoten a ferry-free connection to the mainland. Part 1 of the project (21,4 km) is completed. It consists of four tunnels with a total length of 5,8 km. The longest one is rock sub-sea tunnel (3,3 km). Raftsundet bridge is also a part of the project, which is a balanced cantilever bridge. The length of the bridge is 711 m, and a main span of 298 m. At the time of completion, the bridge had the words longest span for this type of bridge. The cost of the project is 471 mill NOK. The initial estimated cost was 502 mill NOK. The construction work has not started at part 2 of the project. The planning/design work has been very time consuming due to the conflict between environmental and road interests. The Norwegian Parliament made a decision in December 1998 about the location of the road alignment. Technical data for part two: Total length 30 km. Total length of tunnels 9,4 km. Two bridges 300 m and 200 m.
机译:Lofast项目将使人口(25.000)洛菲特与内地无渡轮连接。项目的第1部分(21,4公里)已完成。它由四个隧道组成,总长度为5,8公里。最长的是摇滚亚海隧道(3,3公里)。 Raftsundet Bridge也是该项目的一部分,这是一个平衡的悬臂桥。桥的长度为711米,主要跨度为298米。在完成时,桥梁对这种类型的桥梁具有最长的跨度。该项目的成本为471毫克。最初的估计成本为502米诺科。施工工作尚未在项目的第2部分开始。由于环境和道路利益之间的冲突,规划/设计工作已经非常耗时。挪威议会于一九九八年十二月决定了关于道路对齐的位置。第二部分技术数据:总长度30公里。隧道总长度9,4公里。两个桥300米和200米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号