U.S. BUREAU OF RECLAMATION'S USE OF RISK ANALYSIS AND RISK ASSESSMENT IN DAM SAFETY DECISION MAKING

机译:美国综合局局局在大坝安全决策中使用风险分析和风险评估

获取原文

摘要

Reclamation distinguishes between Risk Analysis and Risk Assessment. Risk Analysis determine the risk at a particular site in qualitative and quantitative terms. Risk Assessment is the process that blends Risk Analysis results with other factors to make a decision on the course of action to take at the site. Risk analyses are undertaken to determine the baseline risk represented by the structure as it now stands and is now operated and monitored and risk reduction analyses may be undertaken to determine impacts of proposed alternatives. Reclamation's current methodology for the project team risk analysis begins with formulation of a project team that includes experts in pertinent technical areas. Once formed, the team begins its analysis with input on load probabilities for hydrologic and seismic events along with input on possible consequences. The team then considers all the possible failure modes for the structure, eliminates the ones considered to be trivial, and moves forward to construction of event trees for those remaining. Event trees are constructed to decompose the failure modes into a logical series of events for further study by the team. Included in the event trees are a breakdown of the loading information into appropriate ranges, events to capture the important steps of the structure's response to the load, events to capture the likelihood of intervention, and finally the consequences from the potential dam failure. Consequences in terms of life loss are always considered along with consideration of other types of consequences as-needed. Once the event trees are constructed, the teams consider all pertinent information on each node of the event tree, a form of expert elicitation is used to estimate the likelihood of each event taking place. Once each node of the event tree has been estimated, the product of the events is taken to represent the risk of this failure mode. The analysis team then considers the overall result to determine if it accurately represents the team's overall perception of the risk.
机译:开垦区分风险分析与风险评估。风险分析在定性和定量术语中确定特定部位的风险。风险评估是将风险分析与其他因素混合的过程,以决定在现场采取行动的过程。承担风险分析以确定结构所代表的基线风险,因为它现在所代表且现已运营和监测,并且可能进行风险降低分析,以确定拟议替代方案的影响。填海工程团队风险分析的现有方法始于一个项目团队的制定,其中包括相关技术领域的专家。一旦形成,该团队就开始分析了对水文和地震事件的负载概率的输入以及可能后果的输入。然后,该团队考虑了结构的所有可能的失败模式,消除了被认为是微不足道的那些,并且向剩余的人建造事件树的建造。构建事件树以将故障模式分解为逻辑系列事件,以便由团队进一步研究。包括在事件树中是将加载信息的分解为适当的范围,事件捕获结构对负载的响应的重要步骤,事件捕获干预的可能性,最后从潜在的坝故障的后果。终于审议终原损失方面的后果始终考虑到其他类型的后果。一旦构建了事件树,该团队就考虑了关于事件树的每个节点的所有相关信息,用于估计每个事件发生的可能性。一旦估计事件树的每个节点,事件的乘积被采用以表示此故障模式的风险。然后,分析团队考虑了整体结果,以确定它是否准确代表团队对风险的总体看法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号