首页> 外文会议>Annual international bridge conference and exhibition >The Design Construction of Double-Deck Post-Tensioned Concrete HPC Bridges for Airport Terminal Frontal Road System
【24h】

The Design Construction of Double-Deck Post-Tensioned Concrete HPC Bridges for Airport Terminal Frontal Road System

机译:机场终端前沿道路系统双层双层张紧混凝土HPC桥梁的设计与施工

获取原文

摘要

Over 40,000 cubic yards of high performance concrete were specified for a cast in place post-tensioned concrete double-deck bridge. Consistently successful placing and in-situ parameters were obtained while satisfying the large concrete volumes and fast track requirements of the project.
机译:在张紧的混凝土双层桥上,为铸造铸造铸造了超过40,000立方米的高性能混凝土。在满足大型混凝土卷和项目的快速跟踪要求的同时获得始终如一地成功的放置和原位参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号