首页> 外文会议>Japan-Korea symposium on nuclear thermal hydraulics and safety >2001 Replacement Plan of Main Component For Genkai Nuclear Power Plant unit 1 and 2
【24h】

2001 Replacement Plan of Main Component For Genkai Nuclear Power Plant unit 1 and 2

机译:2001年核电站主组件的更换计划1和2

获取原文

摘要

Kyushu Electric Power Co., Inc. provides electric power throughout Kyushu region that is located in the southwest of the Japanese Archipelago. We have been operating two nuclear power stations whose power generating capacity accounts for 25 % of our gross power generating capacity of 5,258MW. 45% of our gross power-generating amount is being provided with nuclear power generation. Genkai Nuclear Power station is located in the northwest of Kyushu and is the first plant that we introduced. At Genkai we have been operating four reactors since we started operating the first reactor in 1975. Genkai nuclear power station whose nuclear generating capacity is 3,478MW is the largest one in Kyushu. The appropriate tests and inspections ensure the integrity of equipment for nuclear power plants, but we are planning to replace the main component (reactor vessel closure head for unit 1 and 2, steam generators for unit 2, etc.) in order to improve further the reduction of radiation exposure and the reliability of equipment. This time we introduce the work background and contents and so on about the replacement plan of main component for Genkai unit 1 and 2 whose outage is scheduled in March 2001.
机译:九州电力有限公司提供各种九州地区的电力,位于日本群岛西南部。我们一直运作两台核电站,该核电站的发电能力占我们的总发电量5,258MW的25%。我们提供了45%的核电发电量。 Genkai核电站位于九州西北部,是我们介绍的第一个植物。在Genkai,我们一直在经营四个反应堆,因为我们开始于1975年开始运营第一抗反应器.Genkai核电站,其核发电能力为3,478MW是九州最大的反应站。适当的测试和检查确保了核电厂设备的完整性,但我们计划更换主要成分(用于单元1和2,单元2等的蒸汽发生器,蒸汽发生器等)以进一步提高减少辐射曝光和设备可靠性。这次我们介绍了工作背景和内容,依据了预定于2001年3月预定的Genkai单元1和2的主要组件的更换计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号