首页> 外文会议>International conference on remediation of chlorinated and recalcitrant compounds >Fresh perspectives on site closure guidelines for cost effective remediation
【24h】

Fresh perspectives on site closure guidelines for cost effective remediation

机译:现场闭幕指南的新鲜观点,以实现经济效益的补救

获取原文

摘要

As more sites moven from investigation to active remediation, there is a significantly increased cost burden for long-term operation (LTO) and long-term monitoring (LTM) programs. While there is aboundant guidance for performing site investigation through remedial construction activities, there currently is little gujidance focused on the goal of iste closure. Hill Air Force Base (AFB) developed the Performance Standard and Verification Plan (PSVP) as systematic planning and process improvement tool to guide LTO/LTM toward site closure. The PSVP will minimize toal life cycle costs by defining the remedial process and the specific steps that will lead to the most rapid s ite closure consisten with safety, regulatory requirements, and positive public relations. Sections within the PSVP provide guidance for a wide audience including program managers involved in scope and schedule development technical personnel involved with datqa collection, evaluation, and presentation; field personnel involved with task execution; the public; and regulatory agencies.
机译:随着更多网站从调查到主动补救的调查,长期运营(LTO)和长期监测(LTM)计划有显着增加的成本负担。虽然通过补救施工活动表演现场调查的吸收指导,但目前的是小原子的重点是ISTE关闭的目标。 Hill空军基地(AFB)开发了性能标准和验证计划(PSVP)作为系统规划和过程改进工具,以指导LTO / LTM朝向场地关闭。 PSVP将通过定义补救措施和将导致最迅速的SITE关闭的具体步骤最大限度地减少对寿命周期成本,该步骤将与安全,监管要求和积极的公共关系为准。 PSVP中的部分为广泛的受众提供指导,包括参与参与DatQA收集,评估和介绍的范围和日程安排技术人员的计划经理;现场人员参与任务执行;公众;和监管机构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号