首页> 外文会议>International conference on coastal engineering >Adjustments toward wquilibrium of a large flood-tidal delta after a major dredging program,tauranga harbour,new zeland
【24h】

Adjustments toward wquilibrium of a large flood-tidal delta after a major dredging program,tauranga harbour,new zeland

机译:新茨兰德陶兰加港的大型疏浚计划后对大型洪水三角洲的武访的调整

获取原文

摘要

The port of Taurang ais located within a tidal inlet estuarine lagoon system which has been dredged to imporve navigation for shippiing since 1968.In 1992 a major dredging program deepened the entrance navigation channel through the ebb-tidal delta from 10 to 14 m,and the inner harbor channels to approx 13 m.As a condition fo the consent to d4redge a detailed monitoring program was reuqired which included annual hydrographic surveys ofver the flood and ebb-tidal delta as well as recording current meter records for morphodynamically sensitive locations to compar4e with records taken before the dredging.
机译:陶朗邦港位于潮汐入口河口泻湖系统内,自1968年以来一直被疏浚以推动船舶航行。在1992年的主要疏浚方案通过10至14米的潮流Δδ深化入口导航渠道。 内部港口频道到大约13米的条件,同意D4Redge详细监测计划的统计数据包括洪水和潮汐潮三角洲的年度水文调查,以及记录更换敏感地点的当前仪表记录,以与记录进行比较4E 在疏浚之前采取。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号