首页> 外文会议>Particle Accelerator Conference >The commissioning of the LHC test string 2
【24h】

The commissioning of the LHC test string 2

机译:调试LHC测试字符串2

获取原文

摘要

String 2 [1,2] is a full-size model of an LHC cell of the regular part of the arc. It is composed of six dipole magnets with their correctors, two short straight sections with their orbit and lattice corrector magnets, and a cryogenic distribution line running alongside the magnets. The commissioning of String 2 Phase 1, with one half-cell and the following quadrupole, has started in April 2001. As for String 1 [3], the facility was built to individually validate the LHC systems and to investigate their collective behaviour during normal operation (pumpdown, cool-down and powering) as well as during exceptional conditions such as quenches. String 2 is a stepping stone towards the commissioning of the first sector (one eight of LHC) planned for 2004. It is expected to yield precious information on the infrastructures, the installation, the tooling and the procedures for the assembly, the testing and the commissioning of the individual systems, as well as the global commissioning of the technical systems. This paper describes the procedures followed for the commissioning and details the preparation for the first cool-down and for the powering.
机译:String 2 [1,2]是弧形常规部分的LHC单元的全尺寸模型。它由六个偶极磁铁组成,其校正器,两条短直接部分,其轨道和晶格校正器磁铁,以及与磁铁一起运行的低温配电线。 String 2阶段1的调试,一个半电池和以下四极其,于2001年4月开始。至于String 1 [3],该设施是为了单独验证LHC系统并在正常期间调查它们的集体行为操作(增加,冷却,冷却和供电)以及诸如淬火之类的特殊条件。 String 2是朝向2004年计划调试的踏脚石(LHC中的一八个)。预计将在大会,安装,测试和程序的程序中产生珍贵信息,安装,工具和程序委托个人制度,以及技术系统的全球调试。本文介绍了调试和详细介绍了第一个冷却和电力的准备工作的程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号