【24h】

Containment Mock-up Tests at Walldof, Germany

机译:在德国Walldof的Contine Mock-up测试

获取原文
获取外文期刊封面目录资料

摘要

The Walldorf project is to be seen in the framework of the different activities for the containment design of the European Pressurized Water Reactor (EPR). The research centers around pressure tests using a containment mock-up depicting the main features of a steel reinforced concrete containment with a fibreglass reinforced plastic (FRP) liner. Important questions and potential solutions that are of relevance for a real containment, for instance questions relating to reinforcing arrangements, the design of large penetrations, the application of FRP liners as well as the load carrying characteristics and deformation behaviour of the structure, crack development in steel reinforced concrete and, in particular, the effects of a system consisting of steel reinforced concrete and FRP liner on the leak tightness of containment in the case of large concrete deformations had been investigated.
机译:Walldorf项目将在欧洲加压水反应堆(EPR)的遏制设计的不同活动框架中。使用遏制模拟,研究中心压力试验,描绘了钢筋混凝土容器的主要特征,具有玻璃纤维增​​强塑料(FRP)衬里。重要的问题和潜在解决方案与真正的遏制有关,例如与加强安排有关的问题,大型穿透性的设计,FRP衬里的应用以及结构的承载特性和变形行为,裂纹开发特别地,研究了钢筋混凝土,特别是钢筋混凝土和FRP衬里组成的系统的影响,在大型混凝土变形的情况下,钢筋混凝土和FRP衬垫的漏气紧密性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号