首页> 外文会议>Symposium on fusion technology >Compensation for non-linear interaction between JET NBI deflection magnets for simultaneous D_2/T_2 beamline operation
【24h】

Compensation for non-linear interaction between JET NBI deflection magnets for simultaneous D_2/T_2 beamline operation

机译:用于同时D_2 / T_2波束线操作的Jet NBI偏转磁体之间非线性交互的补偿

获取原文

摘要

Each Neutral Beam Injector at JET is capable of injecting around 10MW D~o or T~o from8 PINI ion sources through one port [1]. There are four Deflection Magnets (one per quadrant) spaced close together. A schematic drawing of a quadrant is shown in fig.1. Each magnet deflects the unneutralised ions from the beams onto a V- shaped Full Energy Ion Dump (FEID) and Fractional Ion Dumps (not shown). Thermocouples in the FEID monitor the power footprint.
机译:在喷射器处的每个中性光束喷射器能够通过一个端口[1]从8个Pini离子源注入约10MW D〜O或T〜O.。有四个偏转磁铁(每象限一个)间隔靠近。象限的示意图如图1所示。每个磁体从梁从梁偏转到V形的全能离子转口(Feid)和分数离子转储(未示出)上。 Feid监控电源足迹的热电偶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号