首页> 外文会议>Annual national meeting of the American Society for Surface Mining and Reclamation >The Western Maryland Coal Combustion By-Products/Acid Mine Drainage Initiative-The Winding Ridge Demonstration Project
【24h】

The Western Maryland Coal Combustion By-Products/Acid Mine Drainage Initiative-The Winding Ridge Demonstration Project

机译:西部马里兰煤燃烧副产品/酸性矿山排水倡议 - 蜿蜒的山脊示范项目

获取原文

摘要

The Maryland Department of Natural Resources Power Plant Research Program (PPRP) and the Maryland Department of the Environment Bureau of Mines (MDE) have undertaken the Western Maryland Coal Combustion By-Products (CCB)/Acid Mine Drainage (AMD) Initiative, which is a joint effort with private industry to demonstrate the beneficial application of alkaline CCBs to create flowable grouts to prevent the formation of AMD. The Initiative is a key component of Maryland's overall ash utilization program to promote and expand the beneficial use of all CCBS. Ultimately, the Initiative is targeting AMD abatement from significant AMD sources in the State, such as the Kempton Mine and Three Forks Run complexes. The Winding Ridge Project is the Initiative's first demonstration of this technology. The Frazee Mine (a small "kitchen" mine), in Garrett County, Maryland, was selected for the demonstration. The CCB grout mixing and mine injection phase was performed in October and November 1996. This phase demonstrated the engineering feasibility and logistics of using 100 percent CCBs and acid mine water to create a grout, which was injected into the Frazee Mine. Approximately 5,600 cubic yards of CCB grout were injected into the mine under both dry and submerged conditions. Observations from borehole camera logging indicated that the grout was capable of flowing at least 100 feet along the mine pavement. Laboratory tests of hardened grout core samples recovered from the mine showed unconfined compressive strengths of over 1,000 pounds per square inch (psi) (28-day strength tests were over 300 psi) and permeabilities of about 10-7 centimeters per second. These observations indicate that the use of CCBs as a grout for mine sealing is a promising technical option for the large-scale beneficial application of these materials. Currently, postinjection water quality monitoring is being performed to better evaluate the long-term effects on the mine discharge. In addition, future work will evaluate the economic feasibility of this technology.
机译:自然资源电厂研究计划(PPRP)和矿山环境局的马里兰州部(MDE)的马里兰部门已经采取了西马里兰煤燃烧副产品(CCB)/矿山酸性废水(AMD)的倡议,这是与私有企业的联合努力证明碱性城市商业银行的有益应用,创造流动性勾缝剂,以防止AMD的形成。该倡议是美国马里兰州的整体粉煤灰的利用计划,以促进和扩大互利使用所有CCBS的一个关键组成部分。最终,该倡议是从国家显著AMD来源,如肯普顿矿和三叉润物靶向AMD减排。缠绕岭项目是该倡议的这项技术的第一个示范。该Frazee矿山(点小“厨房”矿),在加勒特县,马里兰州,被选定为示范。在十月和1996年11月进行该CCB灌浆混合和矿注射阶段该阶段表现出的工程可行性,并使用100个%的CCB的和酸矿井水以产生水泥浆,将其注入到Frazee矿物流。建行灌浆约5600立方码注入干燥和淹水条件下矿井。从井眼测井相机观测表明,水泥浆是能够沿着矿路面流动至少100英尺。硬化水泥浆岩心样品的实验室检测恢复从矿井下显示出超过1000磅每平方英寸(psi)的无侧限抗压强度(28天强度试验超过300磅)和每秒约10-7厘米渗透率。这些观察结果表明,使用城市商业银行作为矿山密封灌浆是这些材料的大规模应用有利于一个有前途的技术选择。目前,注射后水质监测正在执行,以更好地评估对矿井排放的长期影响。此外,今后的工作将评估这一技术的经济可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号