【24h】

Workplace analysis and business process re-engineering: Railway Control Centres

机译:工作场所分析和业务流程重新设计:铁路控制中心

获取原文

摘要

Kowloon-Canton Railway Corporation (KCRC) in Hong Kong is presently responsible for the safe and efficient transportation of large volumes of people. It is one of the very few mass transit railway operators in the world which can be operated without requiring financial subsidy from the government. In the year 2003, KCRC will open a new 30 kilometer railway that will connect Hong Kong with the northern western suburban New Territories, namely the West Rail (WR) Phase I. Railway monitoring and control functions will be performed via a centralized remote control centre supported by a number of smaller control rooms located in stations and depot. The new control centres will be designed and built to support the new railway operations. In creating each new control centre, it is essential to consider to means to reduce operator error and to enhance the manmachine interface. This paper reviews the techniques used to conceptualise the processes in each control centre given that none of it exists today. These modeling techniques make it possible to understand the interaction between the operators and the proposed control and communications systems to enable decisions on staffing levels, ergonomics and other facilities to be assessed and determined. The approach adopted is in line with the modern concept of Business Process Re-engineering. Normal and emergency operational considerations are also modeled to formulate an accurate representation of the working environment. Based heavily on the systematic methodology adopted by human factors experts, the method has proved very useful in completing the conceptual design for all the operations control centres in the new KCRC West Rail project.
机译:九龙湾铁路公司(KCRC)在香港目前负责大量的大量人员的安全有效运输。它是世界上很少有批量交通铁路运营商之一,可以在不需要政府的财政补贴的情况下进行操作。在2003年,KCRC将开设一个新的30公里铁路,将与北部新界北部郊区连接香港,即西轨(WR)第一期I.铁路监控和控制功能将通过集中式遥控中心进行。由位于站和仓库的许多较小控制室支持。新的控制中心将设计和建造,以支持新的铁路运营。在创建每个新的控制中心时,必须考虑减少操作员错误并增强手动界面的意味着。本文审查了鉴于拟议每个控制中心的过程的技术,因为它今天都不存在。这些建模技术使得可以了解操作员与建议的控制和通信系统之间的相互作用,以便对人员配置水平,人体工程学和其他要评估和确定的设施进行决策。采用的方法符合现代业务流程重新工程的概念。还建模正常和紧急操作考虑,以制定工作环境的准确表示。大量基于人类因素专家采用的系统方法,该方法在完成新的KCRC West Rail项目中的所有运营控制中心的概念设计方面非常有用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号