This paper describes the design, construction, and startup operations of a briquetteing plant to recycle the revert dust, sludges and other materials generated from the iron and steelmaking processes. The specific plant constructed for National Steel Corporation's Great Lakes Division was designed to recycle 273,000 metric tons (300, 000 net tons) of integrated steel plant revert materials, such as BOP dust, blast furnace flue dust and sludge, and mill scale. The majority of the briquette plant production, about 80 percent, will recycle through the blast furnace and the remaining 20 percent through the steelmaking furnaces. This paper discusses the criteria used for plant design, construction, and startup. The plant design and construction period was 12 months with construction during the last 33 week period. The startup of the plant proceeded extremely well with the ramping up of production rates faster than the proposed startup plan. In addition, the blast furnace production was initiated using a newly developed blast furnace binder.
机译:本文描述了briquetteing工厂的设计,建造和启动操作,以回收该还原灰尘,淤泥和从铁和炼钢过程中产生的其它材料。国家钢铁公司大湖部门构建的特定工厂的设计到综合钢铁厂复归材料,如BOP粉尘,高炉烟气尘泥,和氧化皮回收273,000吨(300万短吨)。大多数型煤厂生产的,约80%,将通过循环通过炼钢炉的高炉和剩余的20%。本文讨论了用于工厂设计,建设和启动的标准。该工厂的设计和建设周期为12个月,施工期间的最后33周时期。该工厂的启动进行得非常好带的生产速度比建议启动计划越快斜坡上升。此外,高炉生产中采用新开发的高炉粘结剂启动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号