首页> 外文会议>International Pipeline Conference >STRESS CORROSION CRACKING (SCC) INTEGRITY MANAGEMENT PLANS FOR ONSHORE LIQUID AND GAS PIPELINES: SAUDI ARAMCO COMPREHENSIVE STUDY
【24h】

STRESS CORROSION CRACKING (SCC) INTEGRITY MANAGEMENT PLANS FOR ONSHORE LIQUID AND GAS PIPELINES: SAUDI ARAMCO COMPREHENSIVE STUDY

机译:压力腐蚀开裂(SCC)陆上液体和天然气管道的完整性管理计划:沙特阿美综合研究

获取原文

摘要

Stress corrosion cracking (SCC) on buried pipelines results from simultaneous presence of tensile stress, a corrosive environment, and a material that is susceptible to SCC. ASME B31.8S provides a basic framework for determining the SCC susceptible segments of buried pipelines. In-line inspection (ILI) has been effective in the industry for locating and sizing SCC on pipelines. There are some inherent limitations in ILI tools that should be recognized in the development of a comprehensive SCC Integrity Management Plan. Saudi Aramco operates a combined pipeline network of approximately 22,000 kilometers in length. A significant number of Saudi Aramco pipelines were built prior to 1980 with tape coating, thereby increasing the susceptibility to SCC. ILI results from 26 pipelines showed presence of SCC out of 93 pipelines inspected using electromagnetic acoustic transducer (EMAT) and ultrasonic crack detection (UTCD) technologies. These cracks were later verified through direct examination. Besides the basic framework provided in ASME B31.8S, there were no existing criteria to prioritize the susceptible pipeline segments for the SCC threat. Therefore, Saudi Aramco conducted a comprehensive three-phase study to establish a robust integrity management plan for pipelines with SCC. This paper covers details of the third phase of the study, which is about SCC integrity management planning. Companion papers address Phases 1 and 2. The third phase of the study developed SCC integrity management plans (SCC IMPs) for pipelines with SCC based on the work completed on the first and second phases. The SCC IMPs covered SCC susceptibility profiling along pipeline segments, engineering assessment of SCC features, growth analysis, and a process to respond to the SCC threat. The SCC response strategy included further ILI plans, excavations plans, hydrotest benefit assessments and other mitigation measures, such as pipeline partial replacement and recoating. The approach of the SCC IMP will be deployed on all Saudi Aramco pipelines in the future, to prioritize SCC susceptible segments and their mitigation plans.
机译:压力腐蚀裂解(SCC)埋在埋地管道上产生的拉伸应力,腐蚀性环境和易受SCC的材料的存在。 ASME B31.8S提供了一种基本框架,用于确定埋地管道的SCC敏感段。在线检查(ILI)在工业中有效地在管道上定位和施加SCC。 ILI工具中存在一些固有的局限,应该在开发全面的SCC完整性管理计划方面得到认可。沙特阿美公司的长度为约22,000公里的组合管道网络运营。大量的沙特阿美管道在1980年之前用胶带涂层制造,从而增加了对SCC的易感性。 ILI从26个管道的结果显示使用电磁声传感器(EMAT)和超声波裂纹检测(UTCD)技术的93个管道中的SCC出现。这些裂缝后来通过直接检查验证。除了在ASME B31.8S提供的基本框架,没有现行标准为SCC威胁易感管线段的优先级。因此,沙特阿美公司进行了全面的三相研究,为SCC的管道制定了强大的完整性管理计划。本文涵盖了该研究的第三阶段的详细信息,即SCC完整性管理计划。伴随论文地址阶段1和2。研究的第三阶段为基于第一和第二阶段的工作完成的SCC的SCC完整性管理计划(SCC IMPS)开发了SCC。 SCC IMPS沿管道段覆盖了SCC敏感性分析,SCC特征的工程评估,生长分析以及对SCC威胁响应的过程。 SCC响应策略包括进一步的ILI计划,挖掘计划,加氢板效益评估和其他缓解措施,例如管道部分更换和重新涂层。将来,SCC IMP的方法将在未来部署所有沙特阿美管道,优先考虑SCC易感部分及其缓解计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号