首页> 外文会议>Annual Rural Electric Power Conference >Lightning arrester failures and ferroresonance on a distribution system
【24h】

Lightning arrester failures and ferroresonance on a distribution system

机译:避雷器避雷器在配送系统上失败和混合

获取原文

摘要

Since 1987 the Upper Peninsula Power Company (UPPCO) has been experiencing a large number of lightning arrester failures, on a portion of their distribution system in southern Marquette County, Michigan. It was in the area of the US Navy's Extremely Low Frequency (ELF) antenna where the distribution system had been recently reconfigured so that the transformers were connected line-to-line in order to eliminate interference from the antenna. A study was done which determined that the system was susceptible to ferroresonance during single line faults under highly loaded conditions and that the overvoltages experienced could be causing the lightning arrester failures. This conclusion was further strengthened by a statistical study which compared the actual number of failures to an expected number of failures given the system's loading condition and fault rate.
机译:自1987年以来,上半岛电力公司(UPPCO)一直在密歇根州南马奎特县的一部分分配系统上遇到大量雷电避雷器故障。它在美国海军的极低频率(ELF)天线的区域,其中最近重新配置了分配系统,使变压器连接到线路,以消除来自天线的干扰。完成了一项研究,该研究确定了在高负载条件下单线故障期间系统易于对其进行的混合源性,并且过电压可能导致避雷器失效。通过统计研究进一步加强了这一结论,将实际的故障数与预期的故障数进行了比较,因为系统的负载条件和故障率为预期的故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号