首页> 外文会议>Intersociety Energy Conversion Engineering Conference >Coal-fired MHD topping cycle hardware development and test progress at the Component Development and Integration Facility
【24h】

Coal-fired MHD topping cycle hardware development and test progress at the Component Development and Integration Facility

机译:燃煤MHD顶部循环硬件开发和组件开发和集成设施的测试进度

获取原文
获取外文期刊封面目录资料

摘要

The US Dept. of Energy's Component Development and Integration Facility (CDIF) is responsible for the integration of topping cycle components for the national coal-fired magnetohydrodynamics (MHD) development program. A 50 MW/sub t/, pressurized, slag-rejecting, coal-fired combustor (CFC) is used. Recently, a coal-fired precombustor (CFPC) was added. Testing focused on CFC second-state oxygen injector position checkout, Faraday testing, 100% slag carryover configuration, and CFPC checkout. The test results and facility upgrades and modifications made during the CFPC installation shutdown are discussed. Performance and development of the 1A test train hardware at the CDIF and the service history of MSE's nozzle are described. The status of diagnostic and hardware development testing in the diffuser is discussed, and some test results and various developmental hardware designs are presented.
机译:美国部门的能源部件开发和集成设施(CDIF)负责全国燃煤磁性动力学(MHD)发展方案的顶部周期组件的整合。使用50mW / sub T /,加压,矿渣排斥,燃煤燃烧器(CFC)。最近,加入了一种燃煤的预色调(CFPC)。测试专注于CFC第二状态氧气注射器位置结账,法拉第测试,100%渣携带配置,以及CFPC结账。讨论了在CFPC安装停机期间进行的测试结果和设施升级和修改。描述了CDIF的1A测试列车硬件的性能和开发和MSE喷嘴的服务历史。讨论了扩散器中的诊断和硬件开发测试的状态,并提出了一些测试结果和各种发育硬件设​​计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号