【24h】

Network 21C-an update (overhead system protection)

机译:网络21C-更新(开销系统保护)

获取原文
获取外文期刊封面目录资料

摘要

Three distinct stages of overhead power system operation have evolved in East Midland Electricity. Experience has shown that the majority of faults affecting the overhead system were transient, nondamage, and that the best performance, in terms of the lowest 'customer-hours lost' was achieved with minimum numbers of strategically positioned fuses, coupled with automatic reclosing 11 kV switches. This replaced the initial, heavily fused, system design. The third, and current, stage is still that of a minimum 'fused' system but with optimum use of source and pole mounted automatic reclosers, new electronic sectionalisers (which can replace fuses), fault passage indicators and automatic pole mounted isolators.
机译:架空电力系统操作的三个不同阶段在东部米德兰电力中发展。经验表明,影响架空系统的大部分故障都是瞬态的,人间,并且在最低的“客户时段丢失”方面的最佳性能是以最小的策略定位的保险丝实现,加上自动重新旋转11 kV开关。这取代了初始,重金型,系统设计。第三种和电流,阶段仍然是最低的“融合”系统,而是用源极和杆安装的自动重塑器的最佳使用,新的电子切片机(可更换保险丝),故障通道指示器和自动杆安装隔离器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号