首页> 外文会议>IEEE Sustainable Power and Energy Conference >Research on Internal Overvoltage and Insulation Coordination of Offshore Wind Power with Flexible and Direct Grid Connection
【24h】

Research on Internal Overvoltage and Insulation Coordination of Offshore Wind Power with Flexible and Direct Grid Connection

机译:具有灵活直接电网近海风电的内部过电压和绝缘协调研究

获取原文

摘要

Under the flexible DC grid connected mode, the wind power output will have a great impact on the overvoltage transient characteristics under typical operation and fault conditions. It is introduced that the topology structure and typical fault conditions of offshore wind power flexible direct grid connected system. the maximum overvoltage level at the key position of the system is obtained based on PSCAD software, and the decisive fault condition of overvoltage is proposed. The insulation level of key equipment of offshore wind power flexible DC grid connection system is given, which can provide a theoretical reference for the design and insulation coordination of offshore wind power system.
机译:在柔性直流电网连接模式下,风电输出将对典型操作和故障条件下的过电压瞬态特性产生很大影响。介绍了海上风电柔性直接网格连接系统的拓扑结构和典型故障条件。基于PSCAD软件获得系统的关键位置处的最大过电压电平,提出过电压的决定性故障条件。给出了海上风电网连接系统的关键设备的绝缘水平,可以为海上风电系统的设计和绝缘配制提供理论参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号