首页> 外文会议>World Environmental and Water Resources Congress >Flood Hazards from Impoundment Failure in Nuclear Power Plant Sites
【24h】

Flood Hazards from Impoundment Failure in Nuclear Power Plant Sites

机译:核电厂省蓄水损失的洪水危害

获取原文

摘要

As part of the Combined License or Early Site Permit application process for new nuclear power facilities in the US, detailed flood hazard evaluations are required to support the site safety analysis report. Dam failures are one of the flooding events that have to be considered in accordance with the nuclear regulatory requirements. The dams and impoundment facilities postulated to fail could be located on site or upstream of the site. This paper discusses the modeling approaches and methods used in analyzing the flooding resulting from the failure of water impoundment facilities onsite or near the site. In particular, the antecedent conditions, the solution methods and boundary conditions of a 2-dimensional breach model are discussed.
机译:作为合并许可或早期现场许可申请进程的新核电力设施的一部分,需要详细的洪水危险评估来支持网站安全分析报告。大坝失败是必须按照核监管要求考虑的洪水事件之一。假定故障的大坝和蓄水设施可以位于现场或网站上游。本文讨论了用于分析洪水的建模方法和方法,这些方法是由于现场或附近的水蓄水设施失败而导致的洪水。特别地,讨论了先行条件,二维突破模型的解决方案方法和边界条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号