【24h】

A New State Evaluation Algorithm for Rail Transit Power Supply System

机译:一种新的轨道交通供电系统评估算法

获取原文

摘要

In this paper, the existing fuzzy layer-out analysis method is improved, and a fuzzy analytic hierarchy process based on classification and classification is proposed, and the quasi-Newton method is used in the algorithm to deal with higher-order matrices. This method can be applied to more complex multi-factor status assessment scenarios. In addition, this paper also uses a more complete test method to ensure the scientific and rationality of the improved method. After testing and verification, this new type of state assessment algorithm not only breaks through the limitations of the traditional fuzzy analytic hierarchy process, but also is suitable for the state assessment of facilities and equipment at all levels of the rail transit power supply system.
机译:本文提出了现有的模糊层分析方法,提出了一种基于分类和分类的模糊分析层次过程,并在算法中使用了Quasi-Newton方法来处理高阶矩阵。该方法可以应用于更复杂的多因素状态评估方案。此外,本文还采用了一种更完整的测试方法来确保改进方法的科学合理性。在测试和验证之后,这种新型的国家评估算法不仅破坏了传统的模糊分析层次过程的局限性,而且还适用于轨道交通供电系统各级设施和设备的国家评估。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号