From the Rio Grande to the Well Fields in the North: How El Paso Water Manages a Critical 20-Mile Cross City Water Main

机译:从里约热内生到北方的井场:El Paso水如何管理一个关键的20英里十字架城市水线

获取原文

摘要

El Paso Water (EPW) is recognized for their efforts in water conservation and asset management. In 2015, as part of their capital improvement plan EPW implemented a condition assessment program utilizing advanced electromagnetic technologies to evaluate the condition of the their essential 48-in. cross city transmission main (CCTM). Since the program's initiation, EPW has inspected over 6-mi of the CCTM infrastructure. The purpose of the program is to monitor the condition of critical pipes, maximize remaining useful life, prevent unexpected failures, and avoid large scale water-loss events. EPW has successfully employed innovative technology to collect condition data specific to each pipe within the CCTM, allowing each pipe to be managed as an individual asset. The electromagnetic inspection data collected is utilized to determine the structural adequacy of the pipe. In addition, a visual evaluation of the pipeline interior is performed to identify other potential deficiencies. This proactive approach allows EPW to make informed decisions based on reliable and "actionable" data to develop strategic decisions for the repair or replacement of individual pipes approaching failure. Such an approach allows EPW to save significant capital when compared to the significant costs associated with replacing sections of pipe or the entire pipeline. This paper will demonstrate the importance of the CCTM and present an overview of El Paso Water's condition assessment program. Furthermore, the paper will provide cumulative results and include highlights of lessons learned since the program's inception 4 years ago.
机译:El Paso Water(EPW)被认可为他们在水资源保护和资产管理方面的努力。 2015年,作为其资本改进计划的一部分,EPW利用先进的电磁技术实施了一个条件评估计划,以评估其必需品48-IN的条件。交叉城市传输主要(CCTM)。自计划启动以来,EPW已检验超过6英里的中央电信带基础设施。该计划的目的是监控关键管道的状况,最大限度地留下剩余的使用寿命,防止意外的失败,避免大规模的防水事件。 EPW已成功采用创新技术,收集特定于CCTM内的每个管道的条件数据,允许每个管道作为个别资产管理。收集的电磁检查数据用于确定管道的结构性充足性。此外,执行管道内部的视觉评估以识别其他潜在的缺陷。这种主动方法允许EPW基于可靠和“可操作”数据来制定明智的决策,以制定用于修复或更换个人管道的战略决策。与用与替换管道或整个管道的部分相关的显着成本相比,这种方法允许EPW节省大量资本。本文将展示中央CCTM的重要性,并概述了EL Paso水病条件评估计划的概述。此外,本文将提供累积结果,并包括自计划4年前成立以来所吸取的经验教训的亮点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号