首页> 外文会议>Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on >Elevator Group Control Scheduling Approach Based on Multi-Agent Coordination*
【24h】

Elevator Group Control Scheduling Approach Based on Multi-Agent Coordination*

机译:基于多Agent协调的电梯群控调度方法 *

获取原文

摘要

Elevator group control scheduling problem is considered using the approach of multi-agent coordination. Unlike traditional elevator group control scheduling approaches that were implemented by a central agent, this scheduling proposed in this paper was implemented by many elevator agents, and every agent is able to calculate, reason and decide. Based on this, the structure of single elevator agent and the structure of system are designed, and coordination mechanism is then defined. Finally, in computer, the algorithm is simulated and compared with other scheduling algorithms. The results show the approach proposed in the paper can reduce effectively the average waiting time of passengers and rate of waiting long time of passengers, and it indicates an excellent applicability at most of traffic flow pattern.
机译:采用多智能体协调的方法来考虑电梯群控调度问题。与中央代理实施的传统电梯群控调度方法不同,本文提出的调度是由许多电梯代理实施的,每个代理都可以计算,推理和决策。在此基础上,设计了单个电梯代理的结构和系统的结构,并定义了协调机制。最后,在计算机中对该算法进行了仿真,并与其他调度算法进行了比较。结果表明,本文提出的方法可以有效地减少乘客的平均候车时间和乘客的长时间候车率,并且在大多数交通流模式下都具有良好的适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号