首页> 外文会议>High Voltage Engineering and Application-ICHVE, 2008 International Conference on >Measurement problems during lighting hazard simulation on the HV substation
【24h】

Measurement problems during lighting hazard simulation on the HV substation

机译:高压变电站光害模拟过程中的测量问题

获取原文

摘要

This paper presents a practical aspect of lightning ground potential rise (GPR) measurements. They were made during normal operation of the real high voltage substation and according a special procedure developed for this occasion. This procedure does not influence the protection relays and ensures a proper work of the HV substation even for 6kV surges.
机译:本文介绍了闪电接地电位上升(GPR)测量的实际情况。它们是在真正的高压变电站的正常运行期间制造的,并且是为此而开发的特殊程序。该程序不会影响保护继电器,并且即使在6kV的电涌情况下也能确保HV变电站正常工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号