首页> 外文会议>IEEE International Energy Conference >Energy arbitrage of hydrogen-bromine flow battery between the day-ahead and imbalance electricity markets considering price uncertainty
【24h】

Energy arbitrage of hydrogen-bromine flow battery between the day-ahead and imbalance electricity markets considering price uncertainty

机译:考虑价格不确定性的氢溴液流电池在日间和电力市场不平衡之间的能源套利

获取原文

摘要

In this paper, a stochastic model is presented to investigate arbitrage between the day-ahead market (DAM) and the imbalance market (IM) for electricity considering uncertainty of prices. The revenue of arbitrage is calculated for a type of flow batteries, namely Hydrogen-Bromine (HBr) batteries. In order to model uncertainty, scenarios are generated by analyzing the real electricity prices. The required number of scenarios is determined through an iterative algorithm that adds scenarios in each iteration until the normalized change in revenue is less than the predefined value. The simulation is done based on the Dutch DAM and IM electricity prices and revenues are calculated for HBr batteries with different parameters. Also, the investment cost, operation cost, and the connection cost are compared with the calculated revenues and an estimation of the gained profit is reported.
机译:本文提出了一种随机模型来研究考虑价格不确定性的电力的日前市场(DAM)和不平衡市场(IM)之间的套利。对于一种液流电池,即氢溴(HBr)电池,计算套利收益。为了对不确定性进行建模,通过分析实际电价来生成情景。通过迭代算法确定所需的方案数量,该算法在每次迭代中添加方案,直到收入的标准化变化小于预定义值为止。基于荷兰DAM和IM的电价进行了仿真,并计算了具有不同参数的HBr电池的收入。此外,将投资成本,运营成本和连接成本与计算出的收入进行比较,并报告获得的利润的估计值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号